...

Demurrage and Detention: The Charges That Start After the Container Lands

Reading Time: ( Word Count: )

outdoor furniture LCL freight consolidation

Updated April 26, 2024

Demurrage and detention are two different charges with one thing in common: they start counting when something takes longer than the free time allowed. Demurrage applies while a container sits at the terminal; detention applies while it is held outside it before return.

Importers of furniture meet them more often than importers of dense goods, because bulky cargo takes longer to unload and store, and a container that cannot be emptied quickly cannot be returned quickly. The charges are avoidable, but only by planning rather than by reacting.

Outdoor furniture consolidated for an LCL freight shipment

How the Two Charges Differ

Demurrage is charged by the terminal when a container stays beyond the free days allowed for collection. It usually means the paperwork was not ready, the duty was not paid, or the haulage was not arranged in time. The container is physically available; the importer simply has not taken it.

Detention is charged by the shipping line when the container is held after leaving the terminal and is not returned within the free period. It usually means the destination site could not unload fast enough, or that the return arrangement was not planned.

The distinction matters because the fixes differ. Demurrage is mostly a documentary and scheduling problem solved before the vessel arrives. Detention is mostly a capacity problem at the receiving site, solved by matching the delivery to the warehouse’s actual throughput.

Why Furniture Is Exposed

Furniture containers are volume-limited rather than weight-limited, so a shipment can contain a large number of cartons, several product lines and mixed pallet arrangements. Unloading is slower than for a dense commodity, and the space required to stage the goods is larger.

Mixed loads add to the problem. A container holding chairs, tables and case goods may need sorting and counting before it can be signed off, and each additional step consumes time that the free period is counting.

Seasonal peaks make it worse. When terminals are congested, free time can be consumed before the container is even grounded, and the charges begin without any error by the importer. That is a reason to plan arrival timing rather than simply accept the first available vessel.

Export freight documentation set prepared for a shipment

The Paperwork Side

Most demurrage arises from documentation that is not ready when the vessel arrives. The bill of lading must be released, the commercial invoice and packing list must be consistent, and any certificate required for the goods has to be in the broker’s hands before, not after, arrival.

Valuation questions extend the timeline, because a query from customs on the declared value stops the release and starts the clock. Where a shipment includes tooling, samples or a discount, having the treatment settled in advance avoids a conversation conducted against a daily charge.

The documents themselves follow standard conventions and US CBP basic import and export guidance sets out the general import framework for the United States. The practical point is sequencing: the importer’s job is to have the whole set in place before the vessel berths, which means starting the process at the moment of shipment rather than at the moment of arrival.

The Receiving Side

Detention is prevented by knowing how long the destination takes to unload and by booking haulage accordingly. A warehouse that can process one container a day should not have three arrive on the same morning, because two of them will be sitting on wheels.

Live unloading rather than dropping the container is another option where the site can support it, since the equipment is returned directly rather than being stored. It requires labour and dock availability at a specific time, which is a scheduling commitment rather than a cost saving.

Where the goods will be stored, the space has to exist before the container arrives. Furniture staging space is substantial, and a delivery that cannot be put away cannot be unloaded, which is the most common cause of detention in practice.

Furniture container loading prepared for shipment

Planning to Avoid Both

Five steps remove most of the exposure. Confirm the free time on the booking rather than assuming a standard period. Have the full document set with the broker before the vessel sails, not before it arrives. Book haulage and unload labour at the same time as the shipment, not after it. Ensure the receiving space is available before the vessel berths. And keep a contact at the terminal and the forwarder who can be reached during the arrival window rather than the next morning.

Where a shipment is at risk of congestion, notify the forwarder early. Options such as changing the discharge port, delaying the haulage booking or arranging storage near the port cost money, and all of them cost less than several days of demurrage.

Freight charges and these accessorial charges move for different reasons, and both belong in the landed cost model: the mechanisms behind the freight portion are set out in our notes on GRI and peak season fees, and the valuation element in our customs valuation guide. Our sourcing service plans arrival timing with the receiving site as part of the order, because the cost of getting this wrong is entirely avoidable. How a program is split across factories also affects arrival scheduling, as our sourcing case notes describe.

FAQ

What is the difference between demurrage and detention?

Demurrage is charged while a container remains at the terminal beyond free time. Detention is charged while a container is held outside the terminal before being returned.

Why do furniture importers pay these charges more often?

Because bulky cargo takes longer to unload, sort and store, so containers cannot be emptied and returned as quickly as dense goods.

How do I avoid demurrage?

Have the full document set with the broker before the vessel sails, settle valuation questions in advance, and book haulage rather than waiting for arrival.

How do I avoid detention?

Match the delivery schedule to the receiving site’s actual unload capacity, confirm storage space exists, and consider live unloading where the site can support it.

What should I check on the booking?

The free time allowed, because it varies and is the period against which both charges are calculated.

Video: Best Furniture Sourcing Solutions: Riwick, China

▶Best Furniture Sourcing Solutions: Riwick, China

If a shipment is heading into a congested port, send the schedule and the receiving plan. Our import team will check the document set and the delivery timing before the vessel berths rather than after a charge appears.

Related reading: Landed Cost for Furniture Imports: Building the Sheet Before You Buy

Jason Liao

Jason Liao

Author

One of the founders of Riwick and worked for 4 years in the management of a large furniture factory.

He founded Riwick in 2015 and is in charge of web promotion and running the business.

Do You Have A Sourcing Project We Can Help With?

You May Also Like…

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.